Let’s start off focusing on the bulk of the work of the past several days.
It’s very slow right now; a combination of working in the small curving space above her body and the lack of tiles to choose from. Those two things mean it takes a lot of time to find an appropriate tile, a lot of clipping and grinding to make them fit, and a LOT of trips up and down the stepstool. Still, you can see I’m very close to having the entire area above her body filled in! And there is more done out front of her as well (see photo below).
I broke down and bought some tiles at the Mexican-style tile store in Merida. There are several colors here, and I bought one pattern that you can see in the photo. Notice that none of these are soft pastels; Mexican tile is known for its bright colors!
So now the question: is there so much color up there that Sirena is getting lost? Lots of colors; lots of small tiles in a multitude of shapes. Hopefully when it’s all cleaned up and grouted it will all be fine.
Here she is as of the end of April 17. I have at the most one more day of work before our long trip!

Next page: 4 June–We’re back!


You can see all the area still to be filled in out front of her to where the beach rises. But here on the table is ALL the green I have left.
I realized I’ve never posted a photo of one very tedious part of this process. Practically every single tile has excess cement that has oozed out the edges, and we don’t want any of that to show; there always has to be enough depth for the grout to fill up.
I did have some special fun this afternoon.
I did some work in the area above her arm too. That’s filling in pretty nicely.
The other task today was continuing to do the top row. This time I was smarter; rather than go up and down the ladder trying to fit each tile, I laid out about a dozen of them on the table first, and then cemented them up all at once. (That ONLY works for something like this top row, where I only have to match each tile to the ones on each end.)
That whole big blue area under the curve in her tail is finally done. Seems like forever since I started that!
SO now the only blue left is way out on the right side! Lots of cutting, grinding and blue tape today.
Whoa! This morning I had the idea of putting something other than just tile in the large area under the bend in her tail. It’s a LOT of blue, and with the tail being blue already… you get the idea.


… including some right around the two small fish. Compare this photo with that very first one at the top of the post.
Taped up a lot more tiles along the bottom border and primarily in that under-tail area around the two fish. Here’s what that looks like now:

I laid in the beach/ground tile all the way out to the end! That vertical tile marks the far right edge of the entire work. Lots to fill in, but it’s nice to have that marker in place.




A lot more around the tailfin! Being down on the blue I’m focusing on the green. One thing that slows me down and makes this take longer, is I’m working on the top of the wall, so I have to go all the way up and down the stepstool, usually at least three times (often more) for each tile. Since breaking my leg three years ago taking just that many steps off a ladder, I do this very carefully each time. It’s tiring.
Finally, here’s a detail of that one small area under her body, connecting her waist to the bottom of the wall. I end up using a lot of small tiles (and doing quite a bit of nipping and grinding) to make these fit.